Our work speaks for itself.

Mastering the details is the difference between good work and great work. And as we all know, in this business it’s all about your last job, and we want that job to be our best job ever. To learn more about a few of our successes, use the project filter below to select the industry of interest.

Project Filter:

Healthcare

Medical Office Buildings

Beaumont Health & Wellness Center - Rochester Hills, MI

As CM for this project, Marsh was instrumental in all phases of the work including site development, pre-construction, base-building construction as well as tenant build-outs.

Beaumont Neuroscience Center - Royal Oak, MI

New construction of a three-story 80,000 sq. ft. medical office building for Jones Lang LaSalle at Beaumont Health System. Includes demolition of 3 existing buildings, new construction including full basement, complex site work and substantial mechanical system line reworking.

Beaumont Physician Office Building & Cancer Center - Sterling Heights, MI

The new construction of a 13,000 sq. ft. cancer center including two linear accelerators adjoining to the existing Physician Office Building at Beaumont Hospitals’ Troy campus for Beaumont Health System.

DMC Sinai Guild Medical Office Building - Commerce Township, MI

New construction of a two-story medical office building including tenant interior build-outs and associated site work. Detroit Medical Center Huron Valley-Sinai Hospital.

Hospitals

Beaumont Royal Oak Hospital Operating Rooms - Royal Oak, MI

Working in multiple phases to keep from interrupting the daily functions of the department, Marsh managed selective demolition and the installation of new finishes on the walls and floors in all ORs.

DMC & WSU Perinatology Research Branch - Detroit, MI

A federally funded 65,000 sq. ft. multi-phased renovation of and existing space in the Hutzel Women’s Hospital for the Detroit Medical Center and Wayne State University’s Perinatology Research Branch (NICHD/NIH).

DMC Harper University Hospital - Detroit, MI

Demolition and renovation of 28,000 sq. ft. of existing patient units at Harper University Hospital for private/semi-private rooms incorporating “smart” technology.

DMC Rehabilitation Institute of Michigan - Detroit, MI

Renovations of the entire 14,000 sq. ft. 6th floor for the new Neuroscience unit and includes 10 private and 10 semi-private beds, along with all necessary therapy and ADL functions.

Senior Living & Rehab

American House Grosse Pointe at Cottage - Grosse Pointe Farms, MI

The first of its kind for American House, this project includes 84 independent living, assisted living and memory care apartments developed within an existing health care facility. A total of 92,000 sq. ft. and housed on two full floors of the Henry Ford Medical Center.

Church of Christ Care Center - Clinton Township, MI

Phase I included an addition for a chapel and administrative offices, interior guest room renovations, a new outside canopy, patio area and parking lot renovations. Phase II is under construction and consists of extensive interior renovations to nurses stations and guest rooms.

Regency at Canton - Canton, MI

New construction of a one-story 62,000 sq. ft. state of the art nursing facility for Ciena Healthcare Management.

StoryPoint of Grand Ledge - Grand Ledge, MI

A 25,500 sq. ft. expansion to the current independent living community Independence Village of Grand Ledge in Michigan.

Special Environments

Beaumont Royal Oak Hospital Linear Accelerator - Royal Oak, MI

Marsh provided pre-construction and construction services for the suite remodel and installation of the new Elektra linear accelerator equipment.

DMC Children's Hospital of Michigan Cyclotron Suite & Lab - Detroit, MI

Moving the existing cyclotron to a new renovated space with a lab within the hospital.

Retail

Developments

Golden Triangle Center - Auburn Hills, MI

Golden Triangle is an eco-friendly 10,025 sq. ft. retail center near Oakland University developed, constructed and currently...

Kilmer Plaza - Troy, MI

Marsh developed and constructed Kilmer Plaza retail planned unit development (PUD) on Kilmer and Big Beaver Roads in Troy, Michigan.

Normandy Plaza - Royal Oak, MI

Located at the center of the Woodward Dream Cruise, the world’s largest one-day automotive event...

Romeo Commons - Macomb Township, MI

Marsh developed, constructed and managed renovations to the existing building, add a second building and co-manage with REDICO, the up-to-date specialty retail center adjacent to The Mall at Partridge Creek.

Clients

DDR Corp - Various Locations, USA

Our retail team has performed more than 600,000 square feet of complete interior retrofits, build-outs and exterior façade renovations for DDR Corp.

GFS Marketplace - Royal Oak, MI

Marsh was contracted to perform the site work and new construction of a 15,600 sq. ft. GFS Marketplace in Royal Oak, Michigan.

Michigan Schools & Government Credit Union - Royal Oak, MI

This retrofit project consisted of interior and exterior updates and features drive-thru member service, an Internet kiosk for member usage, a coffee bar, and drive-up 24-hour access ATM.

Verizon Wireless - Various Locations, MI

Renovations and reimaging of existing Verizon Wireless stores.

WAL-MART Stores, Inc. - Various Locations, USA

Marsh has successfully completed interior and exterior renovations, construction and re-imaging at 15 Sam’s Club and Walmart locations in four states over a six-year relationship.

Multi-Family

Colonial Square Cooperative - Ann Arbor, MI

Renovation major revitalization of the entire complex 57 buildings consisting of 427 units – the largest one-time renovation in its history.

Mid-Med Plaza - Detroit , MI

The 67,000 sq. ft. Mid-Med Lofts project also included an exterior facelift to the retail spaces. Later, the 17,500 sq. ft. 2nd floor was renovated for Karmanos Cancer Institute.

The Courtyards - Ann Arbor, MI

The Courtyards is a new 319-unit, high-end student housing campus construction project consisting of three, four-story buildings totaling 360,000 square feet on a six-acre site near the University of Michigan and Cooley Law School.

Non-Profit

Genesis the Church - Royal Oak, MI

The renovation and expansion project included a two-story elevator addition and interior renovations in the sanctuary and common areas on the main floor, as well as mechanical and HVAC upgrades, a new sprinkler system and landscaping.

Life Church - Canton, MI

A retrofit and expansion project completed in three phases of construction. Over the last 7 years Marsh has been there to help as this faith community has experienced incredible growth.

Orchards Community Church - Bruce Township, MI

Marsh teamed up with Tagle Associates for the renovation and conversion of a former 20,000 square foot horse barn into a 680-seat church with lobby and café.

Pontifical Institute for Foreign Missions (PIME) - Detroit, MI

Complete interior demolition and remodel of the administration and living areas in the three-story building.

Woodside Bible Church - White Lake, MI

As a preferred contractor, Marsh recently completed a new 18,000 square foot, 900-seat auditorium for the church's worship services.

Education

Chandler Park Academy - Harper Woods, MI

Renovations within the existing building for the 4,500 sq. ft. Charles E. Arnold Media Center which included custom shelving, a reading platform and an upgraded security system. T.H. Marsh was also contracted for playground renovations and installation of new security gates at the academy.

Oakland University Dodge Hall of Engineering - Auburn Hills, MI

Demolition and renovation of the advising offices in Dodge Hall of Engineering. The existing 800 sq ft of interior office space was renovated and expanded to include new ceiling and lighting, floor and wall finishes, new glass entrance, window treatment, and minor corridor upgrades.

University of Michigan Lane Hall - Ann Arbor, MI

Renovations and remodeling of the 3,000 square feet the ground floor of Lane Hall for computer and office use. The work includes selective interior demolition, as well as revisions to plumbing, HVAC, fire protection systems, and electrical service.

Velocity: Macomb Technology Advancement Center - Sterling Heights, MI

The building is a former Ford-UAW preschool that was donated to Macomb County in 2010. Construction work to transform the 35,400 square foot building into a business incubator took about a year. Renovations included electrical and HVAC upgrades, data lines, new finishes and furniture.

WCC Henry S. Landau Skilled Trades Building - Ann Arbor, MI

Marsh performed a complete renovation to the former Storage and Receiving building. The scope of work included demolition of a portion of an existing building and removal of all the surrounding walls exposing the existing structural steel. A second level mezzanine on a portion of the building was added.